USA: Golden Marine Systems has completed the ‘B’ dock construction project for Marine Max Pensacola. The newly constructed dock measures an impressive 358ft (109m) long, has side-to-tie functionality and comprises 19 slips designed to accommodate vessels of up to 70ft (21m) in length. The addition of a 100ft (30m) fuel dock, featuring custom flotation tailored for a ship store, enhances the dock’s versatility.